Customer, Project, Year |
Branch of Industry |
Floor type |
S, m2 |
Radius Group Domodedovo
March-April 2016 |
Warehouse & distribution center Leroy Merlin |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping BASF, curing PermaSeal |
8 200 |
Radius Group Domodedovo
May-June 2016 |
Warehouse & distribution center Leroy Merlin |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping BASF, curing PermaSeal |
74 000 |
Radius Group Domodedovo
May-June 2016 |
Warehouse & distribution center Leroy Merlin |
Reinforced concrete slab with rough surface for outdoor unheated warehouse |
10 000 |
OOO Romex-Kuban Republic of Adygea
February-May 2016 |
Warehouse complex X5 Retail Group |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
29 000 |
OOO Romex-Kuban Republic of Adygea
February-May 2016 |
Warehouse complex X5 Retail Group |
Outdoor slab — logistics platform near the building |
17 000 |
Logopark Sever Moscow region Solnechnogorsk district
Februar-December 2016 |
Office & warehouse complex Retail |
Finished concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
64 000 |
Radius group Domodedovo Technical buildings
June-July 2016 |
Warehouse & distribution center Leroy Merlin Retail |
PU-coating with chemically resistant and antistatic effect |
5 300 |
A Plus Development St. Petersburg Multifunctional wholesale trade complex
July-August 2016 |
Warehouse complex Katren |
Multi-stage polishing of the existing floor slab |
4 500 |
A Plus Engineering St. Petersburg Retail object
June-August 2016 |
Warehouse complex Internet Trade Julmart |
Highly loaded reinforced concrete slab with a thickness of 350 mm, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
15 300 |
A Plus Engineering St. Petersburg Retail object
September-October 2016 |
Warehouse complex Internet Trade Julmart |
Multi-stage polishing of the existing floor slab |
4 000 |
PNK Ekaterinburg
September-November 2016 |
Warehouse complex Perekrestok X5 Retail Group |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
14 000 |
Logopark Sever Moscow region Solnechnogorsk district
March-September 2017 |
Office & warehouse complex X5 Retail Group |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
61 300 |
OOO Argus Logopark Tolmachevo
November-December 2017 |
Warehouse complex |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork Armour Joint, dry-shake topping Sika, curing PermaSeal |
9 500 |
A Plus Development Esipovo
May-December 2017 |
Warehouse complex IKEA |
Highly reinforced concrete slab on the pile field FlorCon Rus Ltd formwork Sinus, liquid chemical hardener Ameripolish. New technology of hardening and surface treatment |
12 500 |
A Plus Development Ufa
May-July 2017 |
Warehouse complex SIGMA Pjaterochka X5 Retail Group |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork Sinus, Armour Joint, liquid chemical hardener Ameripolish |
23 000 |
A Plus Engineering Perm
January-February 2017 |
Warehouse complex Pjaterochka X5 Retail Group |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
3 600 |
Project Development PNK Novosibirsk Tolmachevo
August-September 2017 |
Warehouse complex X5 Retail Group |
Cast-in-situ reinforced concrete floor slab with top hardener, FlorCon Rus Ltd formwork, dry-shake topping Sika, curing PermaSeal |
11 600 |
OOO Junihold Lantmannen Yegoryevsk
February-March 2017 |
Finished goods warehouse Bakery semi-finished products |
Highly reinforced concrete slab, formwork FlorCon Rus Ltd |
2 700 |